Modular HCL Tail Gas Scrubber

(2023年12月11日)

https://www.peiyangchem.com/oil-and-gas-refinery-projects/modular-hcl-tail-gas-scrubber.html

Project Name45000m3/h HCL tail gas scrubber
25000m3/h HCL tail gas scrubber
LocationDaman, Saudi Arabia
TimeNovember, 2014
ClientSteel wire rope manufacturer
Scope of workEPC
PCC provides EPC service, including process engineering design, pipe match, equipment design
& manufacture, electrical appliance & meter installation, site installation guidance, commissioning
and startup, training etc.
DescriptionThe client provided the tail gas component and the local emission requirements. The discharge tail
gas content is much lower than local emission standard This project was delivered within 45 days,
finished installation and commissioning in 5 days.
EvaluationThe plant is running stably since started in November, 2014. The client is very satisfied, and develop
long term cooperation with PCC.